USC directly translates to increased power generation, 35MW of additional power per gas turbine, depending on the model type.
Unlike traditional cooling systems that require lengthy shutdowns for installation and commissioning, USC installation has a minimal impact on GT operation. In fact, shutdowns are only necessary for commissioning, which takes 4 days for Siemens Energy gas turbines and ZERO days for other manufacturers’ units.
The innovative misting system, which uses tap water, guarantees safe operation by preventing wet filters, a common issue with traditional cooling methods. This ensures reliable and uninterrupted performance, minimizing downtime and maximizing plant efficiency.
Siemens Energy's Upstream Cooling system has proven to be beneficial for Iraq's power infrastructure. By boosting power output during critical periods, the system helps ensure a more reliable and stable energy supply for the country.
While the Upstream Cooling system is particularly effective in hot and dry environments like Iraq, Siemens Energy offers a range of solutions tailored to different climate conditions. To find out more about our modernization and upgrade solutions, please visit our webpage.