The TE-TO Osijek power station, a combined heat and power (CHP) plant in Croatia, faced a critical challenge. Specifically, the management of three hot water circulation pumps within the central heating system proved to be unreliable due to frequent breakdowns and difficult maintenance. Downtime and repairs led to increased costs and operational inefficiencies. The customer, Hrvatska elektroprivreda d.d. (HEP Group), sought a solution to enhance reliability and reduce maintenance burdens.