The traditional channels for acquiring power are proving to be too slow for modern data centers. These data centers need tailor-made energy system designs that can deliver power faster, are economically viable and environmentally friendly. These solutions include behind-the-meter electric generation, where a dedicated power generation facility produces the electric generation its host data center requires.
These energy systems must be carefully planned using performance models, component cost models, and optimization objectives to ensure the best possible outcomes for your data centers. Site-specific input data, any mandated renewable generation profiles, and the load profiles of the data center and the local grid must be analyzed to create optimal capacities, resiliency and reliability. Power availability must be considered strategically in the short, medium, and long-term.
If power is needed short term, trailer-mounted gas turbines and generators can be delivered, installed, and operational in a shorter lead time. Designs can incorporate options such as combinations of solar PV, wind turbines, battery storage, H2-ready gas turbines, and fuel cells. These solutions enable data centers to not only obtain the power they need but to also move rapidly towards the achievement of 100% decarbonized operations.
The biggest challenge is finding a way to take the time out of data center construction. It becomes paramount to find a partner that offers a broad portfolio that spans electrical infrastructure, power generation, energy services, construction services, software/controls, installation/commissioning, consulting, advisory, repair, and maintenance services – everything a data center needs to add more electrical capacity rapidly and shorten project timelines.