Siemens Energy offers DEH power supply systems to prevent hydrate formation during planned and unplanned process shutdown.
Our systems will contribute to a consistent flow of hydrocarbons despite challenging fluid characteristics and temperature conditions at the seabed. The respective modules of the systems may contain power electronic components as well as control and protection units for the topside equipment and subsea pipeline to be installed on the platform deck.
The systems are designed to control, compensate and balance the single-phase electrical load that the pipeline and the piggyback cable constitute. Each of the systems is customized to the power requirements and electrical properties of the specified subsea load, in both “heat-up” and “maintain heat” mode. The systems are designed to be optimally tuned at any load condition to ensure an excellent power factor, low harmonic feedback, and to have low negative sequence current - important for minimal impact to the platform power grid.
Auxiliary systems for fiber-optic temperature monitoring of the piggyback cables are offered optionally, as well as solutions for remote connection to the modules’ control and protection system via a secure internet connection.